Wellsboro Area School District – High School Envelope Improvements
Proposed Project encompasses the removal of the existing roof systems down to the deck and total replacement with a modified bituminous roof system on the low slope area and with standing seam metal roofing on the steep slope at the Wellsboro High School. The project also includes the removal of the existing siding and replacement with either a metal wall panel with an alternate to provide fiber cement rain screen system, along with upgrades to the existing subsurface storm water drainage system.
A Mandatory Pre-bid Conference will be held for prospective bidders on Friday January 10, 2025 at 10:00 A.M. at, 225 Nichols Street, Wellsboro, Pennsylvania 16901. Arrangements to visit the project sites must be made through Mr. Rick Warren, Director of Buildings and Grounds, at telephone number (570) 724-3378